Skip to main content

Posts

Featured

Sixth week

1. Bought and assembled all the parts. 2. Physically built the network. 3. Installed. 4. Fully functional network. 5. Configuring all OS to communicate. 6.  Performed some penetration testing and confirmed functionality. 7. Wrote several labs intended to be used by students. 8. Made an updated poster. 9. Maintain a blog. 10. Tech report.

Latest posts

Fifth week (delayed)

Fourth week

Quick update

Third Week

Second Week

First Day

Goals and Objectives